The U.S. Coast Guard Cutter Chase, a 378-ft ship, will prepare to deploy on January 14, 2003.
The deployment training consists of man overboard drills, fire fighting drills and damage control drills all while moored at Naval Station San Diego. This drill will take place between 5 a.m. and 9 a.m.
Related News
20 Jan 2026
Production of Fifth Icon Class Ship Started at Meyer Turku Shipyard
On Monday, January 19, 2026, production of the fifth vessel in the Icon Class began at the Meyer Turku shipyard. The ceremonial…
20 Jan 2026
Research Shows Alarm Overload is Undermining Safety at Sea
Analysis of more than 40 million alarm-related events shows most alarms offer little operational value, disrupt rest and…
20 Jan 2026
Robert Allan Engineer Yufei Huang Earns Professional Accreditation
Robert Allan Ltd. has announced that Ms. Yufei Huang has earned her accreditation as a Professional Engineer with Engineers…
19 Jan 2026
OMS Group Enlists Ulstein to Build Two Next-Gen Cable Layers
Subsea services provider OMS Group has signed contracts with Ulstein for the design and construction of two cable laying…